久久精品欧美人ooxx,国模叶桐尿喷337p人体,国产一区二区三区精品,国产精品无码av无码

您好!歡迎訪問蚌埠三合電子科技有限公司網(wǎng)站!
全國服務咨詢熱線:

18895606220

當前位置:首頁 > 技術文章 > 外貿(mào)地磅參數(shù)配置及安裝步驟

外貿(mào)地磅參數(shù)配置及安裝步驟

更新時間:2016-08-21      點擊次數(shù):2946

一、技術參數(shù):

1、操作工況及技術條件

1.1 環(huán)境氣溫:-30℃~+65℃

1.2 稱重對象:車載特資

1.3 秤體 3X14M

額定稱重:50T\允許軸載30T

精度等:III

刻度20kg

臺面尺寸: 3m×14m   秤臺面板厚度:12mm

安全過載:150%F·S

承重臺超載:200%

結構形式(稱體):U型鋼,箱式密封結構,模塊4節(jié)臺面式,臺面板厚度10MM,秤臺表里刷二道防銹底漆,表面噴灰色面漆。

穩(wěn)定時間:5秒

1.4 防爆傳感器 SQC-30T(橋式)

額定荷載30T;精度:0.02%(即0.02)

安全過載:150%F.S,極限過載:300%F.S

數(shù)量及選型:1臺

防護等:IP67

1.5 稱重信號處理系統(tǒng):

1.6 此套配置為我公司結合自向十年電子衡器制造經(jīng)驗和中外先進半導體技術的結晶。

1)重量顯示:冷色數(shù)碼顯示與超大LED顯示,(附加配置)即一臺秤有兩處同時顯示稱重數(shù)據(jù),使用方便而又有保障。

2)有完整的自檢功能和強大的稱重信息管理功能。

3)非線性+0.01%OF FULL SCALL

4)靈敏度0.8ч V/D溫度系數(shù)  +0.0005%/℃

5)電腦鍵盤式操作鍵

6)電源220VAC 50HZ

7)功能:

◆*的皮重功能:

手動皮重資料輸入

線上皮重資料查詢

200筆皮重資料記憶

◆萬年歷(時鐘功能):

可顯示年/月/日、時/分/秒,自動閏年、閏月

精度:+ 5s/24h,不受斷電影響

◆顯示:

稱重儀表顯示:七位冷色數(shù)碼管顯示、狀態(tài)符指示(零點、不穩(wěn)定偵測、毛重、凈重、皮重輸入、電源) 

資料處理器顯示:背光彩色型液晶顯示屏、中文畫面顯示

◆大屏幕顯示和進入電腦管理的接口設置

◆提供多種磅單格式:單張三聯(lián)式、非碳復寫式

1.7接線盒:專業(yè)穩(wěn)固型設計,采用柔性橡膠密封、5PPM(百成分之五/℃)溫度系數(shù)

1.8精密電阻、防水接頭

1.9穩(wěn)壓電源:SANTAK UPSK500

2、安裝條件:

2.1 秤體為露天安裝,其他按供方要求

2.2 電壓220VAC (-15%~+10%,50Hz)

1. Check all goods against list, pay attention to the steel-seal letter A1、A2、A3、A4、A5、A6、A7、  A8、A9、A10、A11、A12 on the surface of the scale-bodies, load cells, tools wooden cases and   indicator (See the following figure).Be ready to install   A2 A4 A6 A8 A10 A12   A1 A3 A5 A7 A9 A11

2. Scale-body assembling:   Lift the scale-bodies of corresponding marking with the 28mm shackle and assemble with a crane   (usually 15t), overturn and lie them flat(pad wood under the scale bodies to prevent the paint scaling   off), attention to the marking.the marking of A1、A3 with the marking of A2、A4 of the scale-body, the   marking of A5、A7 with the marking of A6、A8 of the scale-body , the marking of A9、A11 with the   marking of A10、A12 of the scale-body, then tighten the scale-bodies with 96 sets of M20X60   socket head cap bolts with M30 adjustable spanner,M20 socket head cap spanner and φ30x500mm   lever. Each pair of bolts including 2 washer, 1 spring washer and 1 thickening nut. See the following   figure:  

3. Installing load cell  Tighten the M16X45 bolts with the lever. Each pair of bolts is including 1 washer and 1 spring  washer.    (Note: The marking on the load cell and scale-body should be consistent.)   Note:a. Install the load cell directly on the back of the markings A1、A2、A11、A12 of the scale-bodies.   b. Install the load cell on connecting-plate of the scale-bodies markings A3、A4、A7、A8 of the  scale-bodies.

4. Place the scale-body into the completed pit

4.1 Fix up one end of the four steel cable in the same length into the installation hole on the  scale-body which marked A1、A2、A3、A4 using the shackle, the other end of the steel cable should   cover with the crane. Ensure the scale-body in level when lifting. The degree of angle of the steel   cable should not less than 45°.   

4.2 Lift the scale-body above the foundation slowly, put δ25~δ30mm thicken wood plate   between the scale-body and the walls of the foundation pit to guarantee the scale-body into center   place. Then put the load cell's steel ball and base-plate of ball-bowl on the foundation plate. Position   scale-body into the foundation .See the following figure:   Thicken Wood  

4.3 Install the second-section scale-body which marked A5、A6、A7、A8, ensure the marking   A5、A6 of the second-section scale-body should be corresponding with the marking A3、A4 of   the first-section scale-body. Place this scale-body into foundation pit slowly and attention to the   position of the joint. make sure the joint hole of joint should be corresponding with the connect   forelock of the first section scale-body. attention to adjusting the clearance about 5~6mm   between the two sections of scale-bodies. The clearance around the scale-body is roundly the   same. See the following figure:

4.4 Lift and install the third-section scale-body(which marked A9、A10、A11、A12),ensure the   marking A9、A 10 of the third-section scale-body should be corresponding with the marking A7、A8   of the second-section scale-body. The installation step the same as the first and second section   scale-body.

5. Adjust the scale-body after placing is finished.

5.1. Check the eight steel-ball of load cell, If the steel-ball can be rotated, jack the scale-body up   in that position with the jack and put the level-adjusting plate under the installation plate for load cell   to make sure the steel-ball can't be rotated.   5.2. Adjust the M30x85 common limit bolts of the scale-body. (Rotate the bolt, it is better that there   is 5mm between the front-end of the bolt and the surface of scale-body, then rotate the nut.) In order   to avoid weighing accurate is not good from big rocking when the truck drives on the scale.

6. Pass out the signal cable from the passing-tube. Tie up the signal cable on the iron wire in the  passing-tube when passing. Then pull the iron wire to achieve the goal of passing. Next join the signal   cable to the junction box. (Attention to the marking on load cell and junction box should be consistent),   then fix up the junction box onto the two side-cover plates.) Then fixup the junction box on the side   cover-plate of the scale-body.

7. Fixup one end of the ground-cable onto the connecting-plate using M16 bolts, and fix up the other  end of the ground-cable onto ball-bowl base under-press using M12 bolts to let the load cell   short-connection, it will protects the load cell from damage by lightning when they are working.   ground-cable  

8. Install the side-cover plate of the load cell: fixup the the cover-plate of load cell on the scale-body  with 24 sets of M10×25 stainless steel common bolts. attention to the marking on the side-cover plate   and the scale-body should be consistent.  

9. Install the bracket: fixup the bracket on the side of the scale-body with the 36 sets of M16×35  common bolts(each pair including 1 washer, 1 spring washer, zinc-galvanizing treatment)  

10. Pass out the signal cable from the PVC tube in foundation and join it into the pounds-room.

11. The installation is finished.

蚌埠三合電子科技有限公司
地址:安徽省蚌埠市蚌山區(qū)聚云商務廣場1號樓722室
郵箱:623226630@qq.com
傳真:86-0552-3073177-808
關注我們
歡迎您關注我們的微信公眾號了解更多信息:
歡迎您關注我們的微信公眾號
了解更多信息
清冷医生受h打开腿乖听话男男 | 98国产精品综合一区二区三区| 国产麻豆一区二区三区精品视频| 亚洲午夜无码久久久久软件| 青青草国产成人99久久| 久久精品中文字幕| 免费国产AV在线观看| 中文字幕在线无码一区二区三区| 热の无码热の有码热の综合| 老头的老枪又粗又长净身老枪图片 | 欧洲美熟女乱又伦免费视频 | 男仆打开双腿让少爷调教| 特级毛片www| 少妇SPA按摩按出水了| 免费无码一区二区三区蜜桃大 | 天天躁日日躁狠狠躁免费麻豆| 老师把腿翘起来我要进去了| 亚洲jlzzjlzz少妇| 国产精品一线二线三线有什么区别| 在线看免费做爰60分钟视频| 妺妺第一次啪啪好紧| 最美情侣韩国片免费观看| 亚洲爆乳精品无码一区二区三区 | 香港AA三级久久三级| 色欲久久久天天天综合网| 末满18禁止看的色视频| 久久er99热精品一区二区| A级毛片高清免费视频在线播放| 大肉大捧一进一出| chinese老女人老熟妇| 富婆被躁30分钟黑人大战| 乖含着睡h1v1| 中国vitafusion孕妇| 多人疯狂的在她体内撞np| 久久久久国产综合av天堂| 门卫老李干了校花高小柔| 日韩精品福利片午夜免费观着| 亚洲乱码一区二区三区香蕉| 色情无码www视频无码区小黄鸭| 特黄做受又粗又大又硬老头| 一区二区三区国产精华液区别|